Avril Lofts, which involves the restoration of four historic buildings, will bring 14 new condominium units to Court Street, ranging from small studios to 2-bedroom flats. Units will feature modern finishes while preserving the historic quirks of the building, with premiere access and views of the newly renovated Court Street Plaza.

The project will enable Avril-Bleh meat market to expand its production and operations, while remaining independently owned. The renovation will produce additional prep space, a new retail setup, and a permanent grill that opens onto Court Street. The project will also create a separate 850-square-foot commercial space next door to Avril’s, which will be owned by 3CDC.

Construction Photos

Essential Facts

  • Developer
    3CDC
  • Project Cost
    $5.28 Million
  • Uses
    Commercial & Residential
  • Number of Units
    14
  • Completion Date
    August 2022
  • Commercial SF
    850

Location

31-37 E COURT STREET

click to interact
$${ popup.detail.title } $${ popup.detail.address} $${ popup.availability == 'available' ? 'Available' : 'Occupied' } View Detail Visit Website

Monthly Updates

Work at Avril Lofts is nearing completion. While facing delays on the delivery of windows, the crews inside have been working hard on finishing touches throughout the units. To date, countertops, backsplashes, electrical and plumbing fixtures have been installed. Paint touch-up is underway and common areas are nearly complete. Once the windows have been installed, the units will be released for sale. Visit the Condos Section of the 3CDC website in the coming weeks to view the units as they are listed.
Avril Lofts are well into the finish stage of construction, as finishing touches are being made on tile, flooring and trim work throughout the condo units. Appliances have been delivered and are currently being installed. The historic stair at the center of the hallway is undergoing restoration and will be an exciting feature of the building. Units are expected to hit the market later this fall.
At Avril Lofts, final finishes are being installed in the third- and fourth-floor condos. On the second floor, cabinet installation is underway. Work has officially started on the final ground-floor commercial space.
Cabinets in the fourth-floor condos at Avril Lofts have now been installed. The installation of wood flooring is underway in the third-floor condos. The second phase of Avril-Bleh Meat Market is complete, which included the expansion of the back-of-house processing facility and a new walk-up grill window. The grill window is now open, so patrons can walk up to order burgers, brats, sandwiches and more!
At Avril Lofts, the installation of hardwood flooring will begin next week inside the condo units. Other finishes, such as tile and painting, are also underway. Additionally, the walk-up grill window for the Avril-Bleh meat market is set to be open early this month. This will allow Avril-Bleh to move its summertime lunch grill inside.
At Avril Lofts, tile work is nearing completion and hardwood floor installation is underway. The new atrium skylight has been installed and permanent power is on throughout the building. The HVAC system is now operational on the second and third floors. Additionally, the new walk-up grill window is being installed in the first-floor Avril Bleh market space and will be operational this summer.
A variety of work is underway at Avril Lofts. Tile is being installed in the fourth-floor condos, while walls are being painted in the third-floor condo units. On the second floor, framing is officially complete and ready for drywall. The building will receive permanent power in the next few weeks and HVAC systems will be turned on, allowing wood floors to be installed. Structural stabilization of the first-floor Avril Bleh market space is complete and ready for drywall and a new walk-in freezer and grease duct.
At Avril Lofts, demolition of the old Avril Bleh market space is complete, and crews will now begin to build their expanded meat processing facility and new walk-up grill window, which will complement the expanded Avril Bleh space that opened last month. On the building’s second floor, demolition and rough framing are complete in the condo units. Drywall hanging is underway in the third-floor condo units and was recently completed in the fourth-floor units. Flooring will be installed in the coming weeks.
At Avril Lofts, the new Avril-Bleh Meat Market opened its doors to the public on Tuesday, Feb. 22. Phase 2 of the Avril-Bleh expansion, which includes the renovation the meat processing facility and addition of a walk-up window, is now underway. Construction of the condo units on the upper floors of the historic buildings continues, with restoration of the historic atrium and rough framing work nearing completion.
Avril Bleh’s new market space is on track to be completed and open for business sometime later this month. Drywall work is nearing completion in the fourth-floor condo units and is ongoing on the third floor. Additionally, rough framing work is being completed in the second-floor units.
At Avril Lofts, construction on Avril Bleh’s expanded commercial space is progressing nicely. Meanwhile, in the residential units on the upper floors, drywall has been hung and the remaining rough-in work is underway. Earlier this month, exterior painting was completed.
Construction on the expansion of Avril-Bleh Meat Market, along with the creation of 14 condo units, is underway. It will remain open in its current location during construction, with a goal of opening its expanded space in early 2022. Structural work on the floors above has started with framing of each residential unit.