Posted on June 29, 2015 by jrudemiller

At 14 Mercer Street (the historic rehab into 4 condos), all interior framing and rough-ins are complete, all new windows have been installed and drywall hanging has started. The new-construction townhomes are 50% framed, with window installation and mechanical rough-ins scheduled to get underway once the framing is finished.