Posted on December 15, 2014 by jrudemiller

Brew tanks were delivered, entering through a window on the building’s north side and put in place with the use of a large crane. A number of the tanks were hoisted up into a tiered, custom structure where the altar once stood. The installation of new wood-framed windows has continued this month, including the large, arched windows over the main entrance. Steel has been installed at the mezzanine level, which will allow for a portion of the floor to extend out over the main beer hall in a semi-circle shape. In addition, Rookwood tile has been installed from floor to ceiling on the walls of the brewing areas, and hexagonal floor tile has been installed in a pattern inspired by the Taft estate on Auburn Avenue.