project-update 12405
Posted on March 26, 2020 by sujvary
The base structure at the 4th & Race project now stands 10 stories tall. A new buckhoist elevator on 4th Street allows for the expedited movement of materials to the upper levels. Work continues at street level and on the façade, and workers are completing the exterior masonry, and installing new glass windows and exterior insulation finishing systems on the columns along Race and Elm streets. There are also new sidewalks, curbs, fire hydrants, and stormwater infrastructure. Inside the building, three stairwells are now in place and the 4th Street elevator is being installed.