Posted on September 30, 2019 by kdriscoll

At Elm Industries, crews are finishing interior paint and installing cabinetry and casework. Installation of the storefront is also underway on the Race Street facade. The elevator and main lobby wall framing are underway, along with installation of the new interior stairs, which is set to begin shortly.