project-update 11221
Posted on April 30, 2019 by kdriscoll
In the 18 months since construction began at the Court & Walnut project, incredible progress has been made and that was celebrated in the topping out ceremony that happened in mid-April. Since the celebration, residential air conditioning units have been installed on the roof, a concrete slab has been installed over the residential elevator shaft, and inspections are underway for floor 11. For additional details, subscribe to regular project updates, and refer to the archive for past updates.