At Beecher Flats, both interior paint and cabinet installation are now complete. Storefront installation is also underway, as well as electrical, plumbing and HVAC fixture install. Crews are also installing the countertops and interior trim.

At Rennen, exterior brick work is complete, with the exception of minor touch-ups that need to be made. Inside the building, the flooring, bathroom tile and cabinets have been installed. Interior trim work and painting continue.