post new_d49334b9703c99b792d328ade250e42c-1

Posted on June 4, 2013 by amileham

Interior demolition has been completed at 1311-1315 Vine Street. As staff works to finalize the financing package for the project, 3CDC and Cintrifuse are working with City Studios Architecture to complete the design of the future Cintrifuse space. In addition Sol Design + Consulting has recently been brought onto the project team to help the project achieve LEED Silver certification.