project-update 4687
Posted on February 13, 2015 by jrudemiller
Installation of the roof membrane is nearly completed at the Drop Inn Center Women’s Facility, after which crews will start hanging drywall. Elsewhere on the building’s exterior, installation of stone sills, face brick, window frames and glass is all ongoing. At the same time, interior framing and rough-ins have continued inside on both the first and second floors.